So the roof is on and walls are about 80% complete. All in all, a sucessful trip. The casualty list is as follows. 1) Backpacking stove fuel pump. 2) My left thumb. 3) My trailer and 4 sheets of plywood. In the future (Spring 2009) will see completion of the rest of the walls, outside trim and roof trim. Until then it’s designing web sites and staying warm.